Metal Industry References
AIRPORTS RUNWAY, APRON, TAXIROUT CONSTRUCTIONS AND EXTENSION, LIGHTING, INFRASTRUCTURAL
WORKS AUTOMOBILE GARAGE CONSTR., ELECTRICITY, INFRASTRUCTURE OF BUILDINGS, ELECTRICAL AND
MECHANICAL FACILITIES WORKS.
| Ref No |
Employer/Authority |
Description of Work |
Location of Work |
Contract Date |
Date of Completion |
| 1 |
DHMI Genaral Directorate of State Airports Authority |
Reparation Work of the Taxiroutes
of Atatürk Airport S.F.G. |
Istanbul |
04.05.1999 |
05.11.1999 |
| 2 |
DHMI Genaral Directorate of State Airports Authority |
Dalaman Airport ILS Sys. Facility Backfill. |
Mugla |
01.05.1998 |
09.07.1998 |
| 3 |
DHMI Genaral Directorate of State Airports Authority |
Dalaman Airport ILS Sys. Ground leveling and energy remote control lines laying Works. |
Mugla |
02.03.1998 |
26.05.1998 |
| 4 |
DHMI Genaral Directorate of State Airports Authority |
Adnan Menderes Airport Urla Search and Resque Station and Karaburun Social Facilities Repairment Work. |
Izmir |
25.05.1997 |
25.06.1997 |
| 5 |
DHMI Genaral Directorate of State Airports Authority |
Antalya Airport. DomesticTerminal Buildings Autopark and Enviromental Works. |
Antalya |
08.10.1996 |
29.01.1997 |
| 6 |
DHMI Genaral Directorate of State Airports Authority |
Additional building to the H1-H2 buildings of Adnan Menderes Airport and connecting taxirout to H2 building. |
Izmir |
13.08.1996 |
01.11.1996 |
| 7 |
DHMI Genaral Directorate of State Airports Authority |
Transformation work of the Antalya Airport External Passanger Salon to Open Standby Salon. |
Antalya |
10.07.1996 |
06.02.1997 |